There are two parts in the ringlock scaffolding job, including tower body part and tower spire part.
The tower has nine levels and four sides, and built-in fittings which are made of steel bars are set in the ninth level roof to stabilize the scaffolding with steel wire rope, since the heavy wind on the hill.
While working, the highest height of scaffolding is 68.7 meters, the longest cantilever is 6 meters.